Parts & goods
Urgent delivery of production material
Sometimes it is not a broken part but simply material that is missing: granulate for moulding, bar stock for machining, film or cartons for the packing line. We collect from the supplier or sister plant and deliver straight to production.
What matters
- Quantity until the next delivery
- Often it is only the quantity missing until the regular delivery.
- Sacks and big bags
- Granulate in sacks or big bags needs pallets and a forklift at both ends.
- Long semi-finished products
- Bars, profiles or tubes determine the load length.
- Hazardous substances excluded
- Consumables such as paints or solvents may be dangerous goods – we check this first.
Planning questions
We clarify these points before quoting – the earlier they are known, the more precise the plan.
- Which material, what quantity?
- In what packaging – sack, big bag, bundle, roll?
- Is it dangerous goods?
- Where in the plant is it unloaded?
What we need from you
- Material and quantity
- Packaging and weight
- Dangerous goods yes/no/unclear
- Unloading point
Preparation: You hand over the shipment packed and released – removal, installation and commissioning are done by your team or the manufacturer's service.
What we do for you
What we organise
- A direct run without transhipment from collection to destination – exclusive vehicle by agreement
- A vehicle to match the shipment: from van to truck, feasibility checked case by case
- One contact who coordinates collection, receiving and papers with everyone involved
Good to know
Dangerous-goods consumables are only taken after a prior check and agreement.
How it works
- 01
Request
You send collection point, destination, shipment and urgency via the form – anything unknown can stay open.
- 02
Review
We check quantity, weight, load length and the dangerous goods question and choose the vehicle.
- 03
Quote
After checking you receive a specific proposal with vehicle, procedure and price – honestly, even if the answer is “tomorrow morning”.
- 04
Execution
Loading at the supplier, direct run, unloading at the agreed point.
Questions and answers: Production material
Do you also deliver granulate or film in an emergency?
Yes, if production depends on it. We need quantity, packaging and weight as well as the unloading point.
What about paints or solvents?
Such consumables may be dangerous goods. We check before confirming whether and how they can be transported.
Do you collect material from another plant?
Yes, from a sister plant or an external warehouse too – with collection reference and contact.
Request
Request for this topic: Production material
Three steps. Anything you do not know yet can be left open.
Details for planning
- Material and quantity
- Packaging and weight
- Dangerous goods yes/no/unclear
- Unloading point