Notfall-Spedition

Parts & goods

Conveyor spare parts fast to the line

When a conveyor stops, everything backs up before and after it. Conveyor spare parts are often long or bulky: rollers, idlers, drive stations, chain strands. Load length and weight determine the vehicle.

What matters

Long parts
Roller tracks, profiles and shafts need load length – we ask for the longest part.
Belts on reels
Conveyor belts are heavy and roll; they need chocks or a frame.
Drive stations
Motor-gearbox units are top-heavy and are fixed on a pallet.
Several parts, one job
Small and large parts often belong together. We load them together.

Planning questions

We clarify these points before quoting – the earlier they are known, the more precise the plan.

  1. Which parts, and how long is the longest?
  2. How heavy are belts or drives?
  3. Is everything at one collection point?
  4. Is there a forklift at destination?

What we need from you

  • Parts list with dimensions and weight
  • Longest dimension
  • Collection point(s)
  • Unloading help

Preparation: You hand over the shipment packed and released – removal, installation and commissioning are done by your team or the manufacturer's service.

What we do for you

What we organise

  • A direct run without transhipment from collection to destination – exclusive vehicle by agreement
  • A vehicle to match the shipment: from van to truck, feasibility checked case by case
  • One contact who coordinates collection, receiving and papers with everyone involved

Good to know

We deliver the parts – installation and commissioning of the conveyor are done by your team or the system builder.

How it works

  1. 01

    Request

    You send collection point, destination, shipment and urgency via the form – anything unknown can stay open.

  2. 02

    Review

    We check load length, weight and securing and choose a van or truck.

  3. 03

    Quote

    After checking you receive a specific proposal with vehicle, procedure and price – honestly, even if the answer is “tomorrow morning”.

  4. 04

    Execution

    Joint loading, secured direct run, unloading at destination.

Questions and answers: Conveyor parts

Do conveyor rollers and profiles fit into a van?

Up to a certain length, yes. Tell us the longest part and we choose the vehicle.

How is a conveyor belt on a reel secured?

On a frame or with chocks against rolling, and lashed as well.

Do you deliver parts for conveyors in logistics centres?

Yes, also for conveyor and sortation systems in warehouses and distribution centres.

Request

Request for this topic: Conveyor parts

Three steps. Anything you do not know yet can be left open.

Details for planning

  • Parts list with dimensions and weight
  • Longest dimension
  • Collection point(s)
  • Unloading help

Prefer to talk directly?

+49 30 346 467 850info@logisticoo.comMon–Fri 8am–6pm Berlin time (CET/CEST)

Route and date

Collection
Destination

We check every route and come back with a proposal.

How urgent is it?

We check after receipt whether a same-day dedicated transport is possible and come back with a proposal.

Date

About the shipment

Dimensions of the largest package (L × W × H)
Total weight
Preferred vehicle (optional)
Are dangerous goods included? (optional)

You can send the delivery note, photos or data sheet after our first reply – no upload is needed here.

Contact and review

Anything that matters for planning.

Your details at a glance

Please review your details. “Edit” takes you back to the step; nothing is lost.